Paver sand calculator for Iowa
Sand for the bed is measured in tons. Sand for the joints is measured in bags. They are separate parts of the work.
Enter your project dimensions
For a 300-square-foot patio, bedding takes about 1.25 tons, but the joints need just 4-8 bags. They are both called sand, yet the quantities are roughly twenty-fold apart. Below, the calculator figures the bedding at exactly 1 inch of coarse material and 1.35 tons per cubic yard. Use the chart below that for joint fill, including coverage for a 50 lb bag of polymeric sand.
Two separate calculations
- Set the bedding quantity from the paving footprint plus the base's 6-inch overhang, using exactly 1 inch. Do not build it deeper, since an oversized sand layer can leave pavers unstable.
- For joints, figure bags rather than tonnage. A 50 lb bag handles 40-75 square feet of ordinary 1/8 to 1/4 inch joints.
Joint bags (50 lb) ≈ Area ÷ 40-75 for standard joints
Bagged joint sand
| Patio size | Standard joints (1/8-1/4") | Wide joints (3/8"+) |
|---|---|---|
| 100 sq ft | 2-3 bags | 4-5 bags |
| 200 sq ft | 3-5 bags | 7-10 bags |
| 300 sq ft | 4-8 bags | 10-15 bags |
| 500 sq ft | 7-13 bags | 17-25 bags |
Paver thickness and joint width change coverage, so use the bag chart and round upward. Keep the extra for filling joints again after the first wash-in drops them by a quarter inch.
Bedding rules for the jobsite
- Screed a one-inch layer over pipes or rails, then fill the grooves as the pavers go down. That is it.
- Choose coarse, angular mason or concrete-grade sand for both uses. Rounded play sand will move when loaded, whether it is under the pavers or in their joints.
- Leave the bedding loose until pavers are placed. Compact the finished paver surface so the units seat into the sand.
- Stay off the screeded layer. Work forward from pavers already laid.
- Compared with sand, screenings create a somewhat firmer bed but leave less allowance for fine leveling. Use the same material throughout the surface.
Plain versus polymeric joint sand
Once wetted, polymeric sand sets up and helps keep weeds, ants, and rain from opening the joints. It costs several times more per bag, has to be installed bone dry, and a mist at the wrong time can ruin the entire sweep. Fine plain mason sand is low cost and quick to install, but plan to top it up after a season or after two. Use polymeric for sloped areas, driveways, and heavily traveled pavers. For a level garden path, mason sand is suitable. Under either choice, use plain coarse sand for bedding, since polymeric belongs in joints only.
The joint-sand maintenance schedule
Rain, ants, and leaf blowers all carry joint sand away. Add more plain mason sand at intervals of a year or two; polymeric commonly holds for 5-10 years before the joint edges open up. Work on a dry day: sweep, compact, then mist. Keep the leaf blower low around filled joints, since the nozzle can slowly remove the sand.
Example: a 20 x 15 patio
For bedding, allow about 320 square feet after adding the overhang. At 1 inch, that is 27 cubic feet, or 1 cubic yard and 1.35 tons. Plan on 1.5 tons of mason sand. For joints, 300 square feet of standard joints needs 4-8 bags of polymeric, or 2-3 bags of mason sand. Under both sits a 4-plus ton crusher run base, calculated with the Paver Base Calculator. Keep the on-site sand pile under a tarp. Sand that is damp-to-dry screeds well; soaked sand does not.
Bedding and joint sand guide
How much sand is needed for pavers?
What area will a 50 lb polymeric sand bag cover?
Is 2 inches of bedding sand excessive?
What does 1 yard of paver sand weigh?
What should I do when regular joint sand washes out?
Does paver sand match play sand?
Other calculators
Use one ton for bedding rather than 25 bags.
Mason and washed sand are delivered free; use bags for the polymeric joint sweep.